|
Drawing Tectonic Land-Art Drawing Project
The duration of the event crossed the threshold of day to night on the day of a major earthquake in the region. An
existing ploughed line in the field used for water run off, was filled slowly with light.
Assisted by Dr Julie Louise Bacon. Site #01 Morecella, Italy 2010
|
|
|
|
 |
 |