Drawing Tectonic
Land-Art Drawing Project
The duration of the event crossed the threshold of day to night on the day of a major earthquake in the region.
A
n existing ploughed line in the field used for water run off, was filled slowly with light.
Assisted by Dr Julie Louise Bacon.
Site #01 Morecella, Italy 2010